• Home
  • Plans & Pricing
    • Classic Range: 21 to 70 SQM
    • Lifestyle Range: 56 to 88 SQM
    • SUB70: 27 to 70 SQM
    • Habitat Range: 60 to 133 SQM
    • Pre-Builds Selling Now
  • Gallery
  • Build Options
    • Cladding Options
    • Shades & Shelters (Shadeland)
    • Waterflow - Waste Water
    • Lewis Gray - Waterless Toilets
    • Ecopile Foundations
  • About Us
    • Contact Us
    • Showhomes
    • Build Locations
    • Our Process
    • Finance
    • Granny Flats - No Consent
    • Project Costs
    • Resource Centre
    • Climate Zones
0800 000 222

Project Costs

Understanding Additional Project Costs

At Footprint Homes, we believe in being transparent from the very beginning. While the cost of your home is relatively straightforward, additional project costs can vary significantly depending on your site, council requirements, access, available services, and overall project complexity. Every property is different. Some sites require minimal additional work, while others may involve engineering, infrastructure upgrades, council approvals, site preparation, or specialist reports. Our goal is to help you understand the full picture early, so you can make informed decisions and avoid unexpected costs later in the process.

Typical Additional Costs May Include:

  • Concept plans and preliminary design
  • Site visits and assessments
  • PIM (Project Information Memorandum)
  • Building and/or resource consents (where required)
  • Surveying and boundary confirmation
  • Geotechnical (soil) reports
  • Foundations and site preparation
  • Stormwater management and drainage
  • Sewerage, septic, or wastewater systems
  • Water tanks, pumps, and water supply infrastructure
  • Off-grid power or solar systems
  • Transport, craneage, and site access requirements
  • Additional onsite construction costs (for onsite builds)

Important Information

  • Many of these costs are charged directly by councils, engineers, surveyors, contractors, and service providers.
  • Pricing varies considerably depending on location, site conditions, and council requirements.
  • Footprint Homes does not add any mark-up to third-party services and can help coordinate trusted professionals on your behalf.
GRANNY FLAT EXEMPTION GUIDELINES
Budget Allowance Guide Based on previous projects, additional site works, council-related costs, and third-party services commonly range from approximately $25,000–$50,000+, depending on the property and project requirements. Exempt Buildings & SleepoutsIn some situations, buildings under 30m² without a bathroom or toilet may fall under different council requirements (such as a sleepout). Rules vary between councils, and we can help determine what may apply to your project. Free Site-Specific EstimateBecause every site is unique, we recommend obtaining our FREE site-specific estimate early in the process. This provides a clearer understanding of the likely total project cost—not just the price of the home itself. Even though the home may be small, building legally and properly requires careful consideration of site, services, and council requirements. We're here to guide you through the process and help identify likely costs before you commit.
CONTACT US
Clever Living Range Draft Ideas Drafts Priced
Builders PartnershipPrivacy Policy Copyright © 2021. All rights reserved.

We use cookies to enable essential functionality on our website, and analyze website traffic. By clicking Accept you consent to our use of cookies. Read about how we use cookies.

Your Cookie Settings

We use cookies to enable essential functionality on our website, and analyze website traffic. Read about how we use cookies.

Cookie Categories
Essential

These cookies are strictly necessary to provide you with services available through our websites. You cannot refuse these cookies without impacting how our websites function. You can block or delete them by changing your browser settings, as described under the heading "Managing cookies" in the Privacy and Cookies Policy.

Analytics

These cookies collect information that is used in aggregate form to help us understand how our websites are being used or how effective our marketing campaigns are.